CHOUPIQUE RD over SPRING GULLY

0.6 MI S OF LA 108 · County 019, Louisiana · Built 2015 · 2 Lanes · 577 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
071000000070244
Year Built
2015
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
577
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.