SOAPSTONE RD over CANEY BRANCH

1.6 MI N of LA 112 · County 003, Louisiana · Built 1999 · 2 Lanes · 306 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
070230519925711
Year Built
1999
Length
23.2 m (76.1 ft)
Max Span
5.8 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
306
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.