ELOI ORTEGO RD over CREEK

0.5 MI. NW OF US 190 · County 003, Louisiana · Built 1992 · 2 Lanes · 240 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
070230292924861
Year Built
1992
Length
10.1 m (33.1 ft)
Max Span
1.5 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
240
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$92,000
Total Project Cost
$138,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.