LA0002 over COLEWA CREEK

4.0 MI EAST OF LA 585 · County 123, Louisiana · Built 1953 · 2 Lanes · 2,725 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
056200370206121
Year Built
1953
Reconstructed
1979
Length
73.8 m (242.1 ft)
Max Span
12.2 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
2,725
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$707,000
Total Project Cost
$1,060,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.