LA0002 over FOURMILE CREEK

1.8 MI WEST OF LA 15 · County 111, Louisiana · Built 1964 · 2 Lanes · 11,805 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

32.785394, -92.433831

This bridge is in worse condition than 81% of bridges in County 111. The average bridge in Louisiana is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
055600700414411
Year Built
1964
Length
42.7 m (140.1 ft)
Max Span
6.1 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
11,805
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$442,000
Total Project Cost
$663,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.