PONY GREER RD over BEE BAYOU

0.5 MI E of LA 3048 · County 083, Louisiana · Built 2005 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

32.434861, -91.718689

This bridge is in worse condition than 32.4% of bridges in County 083. The average bridge in Louisiana is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
054232261914301
Year Built
2005
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
350
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$152,000
Total Project Cost
$228,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.