LA 132 over Little Creek

4.016 MI E LA 135 · County 083, Louisiana · Built 2024 · 2 Lanes · 1,425 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

32.31405, -91.802528

This bridge is in worse condition than 29.9% of bridges in County 083. The average bridge in Louisiana is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
054200000054209
Year Built
2024
Length
36.6 m (120.1 ft)
Max Span
6.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
1,425
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.