RED CUT RD over WATSON BRANCH

MI E HWY 557 · County 073, Louisiana · Built 1981 · 2 Lanes · 270 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
053732222921041
Year Built
1981
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
270
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$145,000
Total Project Cost
$217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.