LA0151 over CREEK

1.87 MI NORTH OF LA 546 · County 073, Louisiana · Built 1958 · 2 Lanes · 2,828 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
053703170101871
Year Built
1958
Length
18 m (59.1 ft)
Max Span
5.8 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
2,828
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$213,000
Total Project Cost
$319,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.