US 80 over I-20

1.69 Mi. E. of LA 151 · County 073, Louisiana · Built 2021 · 2 Lanes · 3,275 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
053700000050279
Year Built
2021
Length
88.4 m (290 ft)
Max Span
44.2 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
3,275
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.