US0080 over STEEP BAYOU

2.4 MI E OF LA 15 · County 073, Louisiana · Built 2017 · 2 Lanes · 13,971 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
053700000050248
Year Built
2017
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
13,971
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.