W BEAR LAKE RD over TENSAS RIVER
9 MI W TALLA BENA · County 065, Louisiana · Built 1950 · 2 Lanes · 187 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
1
Imminent Failure
Superstructure
1
Imminent Failure
Substructure
1
Imminent Failure
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 1 | Imminent Failure |
| Superstructure | 1 | Imminent Failure |
| Substructure | 1 | Imminent Failure |
Location
32.501483, -91.3129
This bridge is in worse condition than 99% of bridges in County 065. The average bridge in Louisiana is 0 years old; this one is 76 years old.
Nearby Bridges
E BEAR LAKE RD #2 over BULL BAYOU
Built 1999
US0080 over BAYOU
Built 1930
E BEAR LAKE RD #3 over BULL BAYOU
Built 1999
LA0579 over JOES BAYOU
Built 1979
GREENBRIAR RD over JOES BAYOU
Built 1987
I0020 over TENSAS-RIVER
Built 1975
I0020 over TENSAS-RIVER
Built 1975
I0020 over DRAINAGE-CANAL
Built 1975
I0020 over TENSAS-RIVER
Built 1975
I0020 over TENSAS-RIVER
Built 1975
Bridge Details
- Structure #
- 053332300911891
- Year Built
- 1950
- Length
- 85.3 m (279.9 ft)
- Max Span
- 25 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 187
- Material
- Steel
- Design
- Truss - Thru
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $564,000
- Total Project Cost
- $846,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.