I0020 over MISSISSIPPI RIVER

.1 MI EAST OF US 80 · County 065, Louisiana · Built 1973 · 4 Lanes · 36,023 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
053304510900001
Year Built
1973
Length
3368.6 m (11051.8 ft)
Max Span
265.2 m
Width
19.8 m (65 ft)
Lanes
4
Daily Traffic
36,023
Material
Steel Continuous
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$43,533,000
Total Project Cost
$65,299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.