LA 3072 over Colvin Creek

0.9 Miles E. of US 167 · County 061, Louisiana · Built 2021 · 2 Lanes · 1,437 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
053100000050029
Year Built
2021
Length
42.7 m (140.1 ft)
Max Span
6.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,437
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.