LA0783 over BAYOU CHICOT

5.23 MI NORTH OF LA 783 · County 081, Louisiana · Built 1969 · 2 Lanes · 590 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
3
Serious
Substructure
4
Poor

Bridge Details

Structure #
044103030105231
Year Built
1969
Length
35.1 m (115.2 ft)
Max Span
5.8 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
590
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$374,000
Total Project Cost
$561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.