LA0005 over BUSHNECK BAYOUREL

4.99 MI NORTH OF US 84 · County 031, Louisiana · Built 1948 · 2 Lanes · 3,931 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
041600490104991
Year Built
1948
Length
29.3 m (96.1 ft)
Max Span
7.3 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
3,931
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$325,000
Total Project Cost
$487,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.