LA0175 over CANEY BAYOU

1.6 MI SOUTH OF LA 5 · County 031, Louisiana · Built 1957 · 2 Lanes · 4,051 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
041600350409281
Year Built
1957
Length
48.8 m (160.1 ft)
Max Span
6.1 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
4,051
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$494,000
Total Project Cost
$741,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.