LA0521 over DRAIN

2.8 MI NORTH OF LA 2 · County 027, Louisiana · Built 1975 · 2 Lanes · 409 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

32.898917, -93.231272

This bridge is in worse condition than 60.1% of bridges in County 027. The average bridge in Louisiana is 0 years old; this one is 51 years old.

Nearby Bridges

Bridge Details

Structure #
041402910202151
Year Built
1975
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
409
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$208,000
Total Project Cost
$312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.