LA0518 over BEAR CREEK

4.79 MI. W. OF LA 154 · County 027, Louisiana · Built 2013 · 2 Lanes · 467 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
041400000040331
Year Built
2013
Length
121.9 m (399.9 ft)
Max Span
15.2 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
467
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.