Gilbert at Fern over OCKLEY DITCH

1.1 MI. NO.OF PIERRE · County 017, Louisiana · Built 1964 · 4 Lanes · 2,480 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
040932282934421
Year Built
1964
Length
28.3 m (92.8 ft)
Max Span
27.4 m
Width
16.2 m (53.1 ft)
Lanes
4
Daily Traffic
2,480
Material
Steel
Design
Girder and Floorbeam System
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$327,000
Total Project Cost
$490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.