PIERREMONT AVE over BAYOU PIERRE

0.8 MI WEST OF LA 1 · County 017, Louisiana · Built 1985 · 4 Lanes · 14,451 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
040932273934411
Year Built
1985
Length
46 m (150.9 ft)
Max Span
16.8 m
Width
18.2 m (59.7 ft)
Lanes
4
Daily Traffic
14,451
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$567,000
Total Project Cost
$850,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.