MT ZION RD over BRUSH BAYOU

0.6 MI WEST OF LINWOOD AV · County 017, Louisiana · Built 1979 · 2 Lanes · 2,828 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
040932248934642
Year Built
1979
Length
67.1 m (220.1 ft)
Max Span
6.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,828
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$456,000
Total Project Cost
$684,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.