Tucson Lane over TUCSON LN TRBY BUCHAN B.

1 mile SE of La 525 · County 017, Louisiana · Built 1984 · 2 Lanes · 39 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
040932209935141
Year Built
1984
Length
11.6 m (38.1 ft)
Max Span
5.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
39
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$109,000
Total Project Cost
$163,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.