LA0529 over CREEK

6.58 MI NORTH OF LA 160 · County 015, Louisiana · Built 1973 · 2 Lanes · 590 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

32.905967, -93.499067

This bridge is in worse condition than 66.9% of bridges in County 015. The average bridge in Louisiana is 0 years old; this one is 53 years old.

Nearby Bridges

Bridge Details

Structure #
040808080106581
Year Built
1973
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
590
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$208,000
Total Project Cost
$312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.