LA0330 over RAMSEY CANAL

4.58 MI S. OF LA 82 · County 113, Louisiana · Built 1959 · 2 Lanes · 1,814 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
035703970104581
Year Built
1959
Length
36.6 m (120.1 ft)
Max Span
6.1 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,814
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$390,000
Total Project Cost
$585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.