LA0092 over B GRAND MARAIS

0.7 MI E. OF LA 700 · County 113, Louisiana · Built 1961 · 2 Lanes · 5,170 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
035702130300701
Year Built
1961
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
5,170
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000
Total Project Cost
$412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.