LA0082 over VERMILION R PERRY

1.0 MI S. OF LA 330 · County 113, Louisiana · Built 1955 · 2 Lanes · 2,899 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
035701940707511
Year Built
1955
Length
116.7 m (382.9 ft)
Max Span
22.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,899
Material
Steel
Design
Movable - Lift
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,073,000
Total Project Cost
$1,609,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.