LA0182 over ATCHAF.R/BERWICK BAY
1.4 MI WEST OF US 90 · County 101, Louisiana · Built 1933 · 2 Lanes · 12,788 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 2 | Critical |
Location
29.695706, -91.216669
This bridge is in worse condition than 97.6% of bridges in County 101. The average bridge in Louisiana is 0 years old; this one is 93 years old.
Nearby Bridges
US0090 over ATCHAFALAYA RIVER
Built 1975
US0090 over La 182/LA70/LOC/DRAINAGE
Built 1977
US0090 over US 90 EB ON RAMP
Built 1977
US0090/Ramp E over 3rd St
Built 1977
US0090 over WEST APPR ATCHAFALAYA R
Built 1977
US0090 over RAMP F
Built 1977
US0090 over ON-RAMP
Built 1977
US0090 over 6th
Built 1977
US0090/RAMP A over US 90
Built 1977
US0090/Ramp C over 6th St.
Built 1977
Bridge Details
- Structure #
- 035100050100001
- Year Built
- 1933
- Length
- 1141.8 m (3746.1 ft)
- Max Span
- 185.3 m
- Width
- 9 m (29.5 ft)
- Lanes
- 2
- Daily Traffic
- 12,788
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,739,000
- Total Project Cost
- $14,608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.