Poche Bridge Rd over TECHE BAYOU
0.08 Mi S of LA 31 · County 099, Louisiana · Built 1974 · 2 Lanes · 4,252 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
30.311797, -91.902736
This bridge is in worse condition than 76.1% of bridges in County 099. The average bridge in Louisiana is 0 years old; this one is 52 years old.
Nearby Bridges
I0010-W over LA 328
Built 2020
I0010-E over LA 328
Built 2020
Lion Castille Rd over BAYOU PORTAGE GUIDRY
Built 2014
I0010 over BAYOU TECHE
Built 1970
I0010 over BAYOU TECHE
Built 1970
LA0094 over BAYOU TECHE
Built 1980
LA0031 over DRAINAGE CANAL
Built 1957
LA0031 over I-10
Built 1970
E. Refinery Rd. over TECHE BAYOU
Built 2010
Auguillard Rd over COULEE
Built 1975
Bridge Details
- Structure #
- 035030187915411
- Year Built
- 1974
- Length
- 64 m (210 ft)
- Max Span
- 5.8 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 4,252
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $436,000
- Total Project Cost
- $654,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.