US0190 over SLOW BAYOU W.B.

2.8 Mi W of US 71 · County 097, Louisiana · Built 2005 · 2 Lanes · 20,176 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
034900121313282
Year Built
2005
Length
316.1 m (1037.1 ft)
Max Span
15.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
20,176
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,704,000
Total Project Cost
$4,056,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.