E. Butcher Switch over DRAINAGE COULEE

0.58 Mi E of I-49 · County 055, Louisiana · Built 1981 · 2 Lanes · 1,122 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

30.289417, -92.006692

This bridge is in worse condition than 50.8% of bridges in County 055. The average bridge in Louisiana is 0 years old; this one is 45 years old.

Nearby Bridges

Bridge Details

Structure #
032830173920021
Year Built
1981
Length
11.6 m (38.1 ft)
Max Span
5.8 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
1,122
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.