E Kaliste Saloom over COULEE DES POCHES

0.6 SW of US 90 · County 055, Louisiana · Built 1991 · 5 Lanes · 12,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
032830116920031
Year Built
1991
Length
29.9 m (98.1 ft)
Max Span
6 m
Width
23.7 m (77.8 ft)
Lanes
5
Daily Traffic
12,400
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.