US0090 over NEW IBERIA SOUTHERN CANA

1.10 Mi W of LA 83 · County 045, Louisiana · Built 1999 · 2 Lanes · 12,192 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
032304240409826
Year Built
1999
Length
36.6 m (120.1 ft)
Max Span
6.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
12,192
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$390,000
Total Project Cost
$585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.