Frontier Rd over BAYOU COCODRIE

0.03 MI W of LA 115 · County 039, Louisiana · Built 2004 · 2 Lanes · 55 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
032030535921871
Year Built
2004
Length
42.7 m (140.1 ft)
Max Span
6.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
55
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.