LA0315 over FALGOUT CANAL
11.0 MI SOUTH OF LA 661 · County 109, Louisiana · Built 1964 · 2 Lanes · 2,378 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
29.411936, -90.782853
This bridge is in worse condition than 90.7% of bridges in County 109. The average bridge in Louisiana is 0 years old; this one is 62 years old.
Nearby Bridges
THERIOT VOISIN BR over DU LARGE BAYOU
Built 2011
BRADY BRIDGE RD over DU LARGE BAYOU
Built 1960
FALGOUT CANAL RD over HOUMA NAVIGATION CANAL
Built 1958
ST ELOI RD over DULARGE BAYOU
Built 2013
DR. BEATROUS RD over MARMANDE CANAL
Built 1960
LA0315 over PROVOST BAYOU
Built 1953
SHRIMPERS ROW RD over KINGS BAYOU/COULEE CANAL
Built 2017
Shrimpers Rowe over CANAL
Built 1991
FALGOUT CANAL RD over GRAND CAILLOU BAYOU
Built 1976
COMBON BRIDGE RD over GRAND CAILLOU BAYOU
Built 1990
Bridge Details
- Structure #
- 025502450207341
- Year Built
- 1964
- Length
- 61.6 m (202.1 ft)
- Max Span
- 41.1 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,378
- Material
- Steel
- Design
- Movable - Swing
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $603,000
- Total Project Cost
- $904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.