Point ala Hache Fe over MISS. RIVER FERRY RAMP

0.01M WEST OF LA 39 · County 075, Louisiana · Built 1960 · 1 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
023829344894761
Year Built
1960
Length
22.6 m (74.1 ft)
Max Span
22.6 m
Width
5.9 m (19.4 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$180,000
Total Project Cost
$270,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.