LA0023 over ALGIERS OUTFALL CANAL
3.2 MI SE OF WESTBANK EXP · County 075, Louisiana · Built 1968 · 2 Lanes · 25,594 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
29.877711, -90.016392
This bridge is in worse condition than 17.1% of bridges in County 075. The average bridge in Louisiana is 0 years old; this one is 58 years old.
Nearby Bridges
LA0023 over ALGIERS OUTFALL C
Built 1968
LA3017 over BAYOU BARATARIA
Built 1971
LA 23 over Intercoastal Waterway
Built 2024
LAPALCO BLVD over OAKWOOD CANAL
Built 1960
LAPALCO BLVD over OAKWOOD CANAL
Built 1977
MT. LAUREL DR over OAKWOOD CANAL
Built 1992
LA0023 over I C WATERWAY
Built 1968
LA0023 over OAKWOOD CANAL
Built 1992
HARVEY BLVD over TRAPP CANAL
Built 1984
LA0023 over BAYOU BARRIERE
Built 1955
Bridge Details
- Structure #
- 023800620200061
- Year Built
- 1968
- Length
- 61 m (200.1 ft)
- Max Span
- 6.1 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 25,594
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $598,000
- Total Project Cost
- $897,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.