MAYO ROAD over MORRISON CANAL
0.0 MI. S.OF.MORRISO · County 071, Louisiana · Built 1960 · 2 Lanes
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
30.03245, -90.004842
This bridge is in worse condition than 75.1% of bridges in County 071. The average bridge in Louisiana is 0 years old; this one is 66 years old.
Nearby Bridges
MAYO ROAD over MORRISON CANAL
Built 1960
MORRISON RD over LAWRENCE CANAL
Built 1960
Morrison Rd over SAINT CHARLES CANAL
Built 1960
Morrison Rd over SAINT CHARLES CANAL
Built 1960
I0010 over LAWRENCE CANAL
Built 1970
I0010 SERVICE RD over LAWRENCE CANAL
Built 1970
Martin Dr over MORRISON CANAL
Built 2012
I0010 Service Rd over LAWRENCE CANAL
Built 1970
I0010 over LAWRENCE CANAL
Built 1970
Crowder BLVD over DRAINAGE CANAL
Built 1975
Bridge Details
- Structure #
- 023630019900032
- Year Built
- 1960
- Length
- 14.9 m (48.9 ft)
- Max Span
- 5.8 m
- Width
- 11.2 m (36.7 ft)
- Lanes
- 2
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $131,000
- Total Project Cost
- $196,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.