PALMETTO ST over AIRLINE HWY. KCS RR
.50 MI.W.OF CARROLTON AVE · County 071, Louisiana · Built 1960 · 2 Lanes
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
29.970158, -90.115044
This bridge is in worse condition than 75.1% of bridges in County 071. The average bridge in Louisiana is 0 years old; this one is 66 years old.
Nearby Bridges
EAGLE ST over METAIRIE RELIEF CANAL
Built 1990
US0061 over METAIRIE RELIEF CANAL
Built 1939
CAMBRONNE ST over PALMETTO AVENUE CANAL
Built 1985
US0061 over METAIRIE RELIEF CANAL
Built 1939
LA6119 over METAIRIE RELIEF CANAL
Built 2000
JOLIET ST over PALMETTO AVENUE CANAL
Built 1985
Palmetto St OnRamp over KCS RR
Built 1960
I0010 over ON RAMP TO I10 W.
Built 1963
I0010 over GROUND
Built 1977
I0010 over I-10 WEST TO US 61
Built 1961
Bridge Details
- Structure #
- 023629523900762
- Year Built
- 1960
- Length
- 350.8 m (1150.9 ft)
- Max Span
- 29.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,094,000
- Total Project Cost
- $3,141,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.