LA0407 over WOODLAND HWY NORMAN CANA

1.15 MI SOUTH OF LA 428 · County 071, Louisiana · Built 1982 · 4 Lanes · 8,495 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
023608360801152
Year Built
1982
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
13.4 m (44 ft)
Lanes
4
Daily Traffic
8,495
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$208,000
Total Project Cost
$312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.