US0090-B over GROUND
1.2 MI. E. OF MISS RIVER · County 071, Louisiana · Built 1995 · 2 Lanes · 7,620 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.932181, -90.038003
This bridge is in worse condition than 7.6% of bridges in County 071. The average bridge in Louisiana is 0 years old; this one is 31 years old.
Nearby Bridges
US0090-B over LA 428/RAMPS
Built 1989
US0090 over US-90 RAMPS
Built 1989
US0090-B over DRIVEWAY
Built 1995
US0090 over ON RAMP
Built 1989
US0090-B over LA.428 US.90 W/B POLICE
Built 1993
US0090-B over LA 428/US 90B/RAMPS/STS
Built 1989
US0090-B over LA 428
Built 1993
US0090-B over LA.428
Built 1993
US0090 over LA-428 CITY STREETS
Built 1989
COPERNICUS ST over ALGIERS CANAL
Built 1993
Bridge Details
- Structure #
- 023602830804193
- Year Built
- 1995
- Length
- 98.1 m (321.9 ft)
- Max Span
- 23.5 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 7,620
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $915,000
- Total Project Cost
- $1,372,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.