LA0039 over N O P B RR(CLAIBORNE AVE
.6 MI EAST OF LA 3021 · County 071, Louisiana · Built 1949 · 2 Lanes · 36,993 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
29.973239, -90.045017
This bridge is in worse condition than 89.2% of bridges in County 071. The average bridge in Louisiana is 0 years old; this one is 77 years old.
Nearby Bridges
LA0039 over N O P B RR (ROBERTSON ST
Built 1962
N GALVEZ ST over RR YARD @ GALVEZ ST
Built 1950
Louisa St over Florida Ave Canal
Built 2020
ALMONASTER AVE RR over FLORIDA AVE.
Built 1960
Peoples Ave over DRAINAGE DITCH
Built 1960
I0010 over OFFRAMP-ELY. FDS.
Built 1974
I0010 over ON RAMP-ELY FDS.
Built 1974
FRANKLIN AVE over FLORIDA CANAL / RR
Built 1950
FRANKLIN AVE over FLORIDA CANAL / RR
Built 1950
I0010 over CITY STREETS
Built 1968
Bridge Details
- Structure #
- 023600463101202
- Year Built
- 1949
- Length
- 358.4 m (1175.9 ft)
- Max Span
- 24.1 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 36,993
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,057,000
- Total Project Cost
- $4,585,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.