MARY BETH AVE over HOLLYWOOD CANAL
0.6 MI N. OF LA 316 · County 057, Louisiana · Built 1968 · 2 Lanes · 411 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 3 | Serious |
Location
29.673267, -90.704492
This bridge is in worse condition than 91.5% of bridges in County 057. The average bridge in Louisiana is 0 years old; this one is 58 years old.
Nearby Bridges
LA0316 over ST LOUIS CANAL
Built 1972
US0090 over DRAINAGE CANAL
Built 1982
US0090 over DRAINAGE CANAL
Built 1982
BAYOU GARDENS BLVD over ST. LOUIS BAYOU
Built 2017
LA0182 over HOLLYWOOD CANAL
Built 1957
COUNTRY ESTATES DR over ST LOUIS BAYOU
Built 1967
LA0660 over ST LOUIS CANAL
Built 1958
LA0182 over CARO CANAL
Built 1957
US0090 over DRAINAGE CANAL
Built 1982
US0090 over DRAINAGE CANAL
Built 1982
Bridge Details
- Structure #
- 022929403904231
- Year Built
- 1968
- Length
- 21.6 m (70.9 ft)
- Max Span
- 5.8 m
- Width
- 6 m (19.7 ft)
- Lanes
- 2
- Daily Traffic
- 411
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $174,000
- Total Project Cost
- $261,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.