LA0655 over BAYOU LAFOURCHE
.79 MI EAST OF LA 1 · County 057, Louisiana · Built 1940 · 2 Lanes · 2,380 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
29.64705, -90.53675
This bridge is in worse condition than 91.5% of bridges in County 057. The average bridge in Louisiana is 0 years old; this one is 86 years old.
Nearby Bridges
LA0001 over CO CANAL LOCKPORT
Built 1959
BARRIOS STREET over FORTY ARPENT CANAL
Built 1969
LA0308 over DRAINAGE CANAL
Built 1965
LA3220 over BAYOU LAFOURCHE
Built 1986
LA0654 over BAYOU LAFOURCHE
Built 2003
US0090 over CUTOFF BAYOU
Built 1984
US0090 over ON RAMP FROM LA1
Built 1976
US0090 over OFF RAMP TO LA1
Built 1976
US0090 over ON RAMP FROM LA308
Built 1976
US0090 over B.CUTOFF
Built 1976
Bridge Details
- Structure #
- 022908291400791
- Year Built
- 1940
- Length
- 76.2 m (250 ft)
- Max Span
- 64.6 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 2,380
- Material
- Steel
- Design
- Movable - Swing
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $728,000
- Total Project Cost
- $1,092,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.