CAUSEWAY BLVD over US 61 & LA 611-9 & CIRCL

0.6 MI N OF US 90 · County 051, Louisiana · Built 1957 · 4 Lanes · 44,036 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
022629588900941
Year Built
1957
Length
419.7 m (1377 ft)
Max Span
22.9 m
Width
20 m (65.6 ft)
Lanes
4
Daily Traffic
44,036
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.