PALM ST over METAIRIE RELIEF CANAL
0.01M NORTH OF ORPHEUM · County 051, Louisiana · Built 1993 · 2 Lanes · 2,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.975992, -90.125611
This bridge is in worse condition than 42.5% of bridges in County 051. The average bridge in Louisiana is 0 years old; this one is 33 years old.
Nearby Bridges
PALMETTO ST over 17 TH STREET CANAL
Built 1991
Monticello Ave over PALMETTO CANAL
Built 1960
CHERRY ST over PALMETTO AVENUE CANAL
Built 1985
Palmetto St OnRamp over KCS RR
Built 1960
LA3139 over ST. R/R
Built 1982
US0061 over METAIRIE RELIEF CANAL
Built 1939
LA3139 over PARISH LINE OVERPASS
Built 1982
LA3139 over STS. R/R
Built 1982
US0061 over METAIRIE RELIEF CANAL
Built 1939
LA3139 over JEFF/ORLEANS PARISH LINE
Built 1982
Bridge Details
- Structure #
- 022629585900761
- Year Built
- 1993
- Length
- 33.2 m (108.9 ft)
- Max Span
- 33.2 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.