US0090-B over RAMP MC-3
2.2 MI EAST OF LA 23 · County 051, Louisiana · Built 1984 · 1 Lanes · 15,955 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.895981, -90.089758
This bridge is in worse condition than 65.4% of bridges in County 051. The average bridge in Louisiana is 0 years old; this one is 42 years old.
Nearby Bridges
US0090-B over RAMP MC-4
Built 1984
US0090-B over RAMP BA-2
Built 1984
US0090-B over RAMP BA-1
Built 1984
MEDICAL CENTER BLV over AVENUE D CANAL
Built 1990
13TH ST over AVENUE D CANAL
Built 1996
WICHERS DR over AVENUE D CANAL
Built 1990
US0090-B over ON RAMP TO US 90 BUS WB
Built 1992
US0090-B over U-TURN LANES
Built 1992
LA0018 over HARVEY CANAL
Built 1975
JOHN EHRET SCHOOL over PATRIOT CANAL
Built 2015
Bridge Details
- Structure #
- 022602830903648
- Year Built
- 1984
- Length
- 168.9 m (554.1 ft)
- Max Span
- 45.7 m
- Width
- 7 m (23 ft)
- Lanes
- 1
- Daily Traffic
- 15,955
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,510,000
- Total Project Cost
- $2,265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.