W Napolean over Canal 4

.1 mile east of Cleary · County 051, Louisiana · Built 2003 · 1 Lanes · 2,146 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
022600000000075
Year Built
2003
Length
7.6 m (24.9 ft)
Max Span
2.4 m
Width
67.7 m (222.1 ft)
Lanes
1
Daily Traffic
2,146
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.