LAUREL AVE over TERRY PKWY DRAIN

0.2 MI N OF LA 23 · County 051, Louisiana · Built 2017 · 6 Lanes · 2,500 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
022600000000066
Year Built
2017
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Width
909.8 m (2984.9 ft)
Lanes
6
Daily Traffic
2,500
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.