I-75 NC over CUMBERLAND R.& CROLEY RD

1 MI S OF S-NTRCH US 25W · County 235, Kentucky · Built 1965 · 2 Lanes · 18,896 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
118B00045L
Year Built
1965
Length
204.2 m (669.9 ft)
Max Span
60.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
18,896
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,990,000
Total Project Cost
$2,989,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.